Learn more about Construction Waste in E7
Construction waste removals from building sites in E7 produced 91,429 tonnes of construction waste from around 98 active construction sites, all of this construction waste needs to be recycled properly in order for the area of E7 to become more sustainable.
Construction waste is any waste generated from construction activities, whether it is from a site clearance in E7, excavation, renovation, refurbishment, demolition, or road works a lot of it is generated so currently it is a big ask to even think about achieving zero waste within the construction sector, however small steps in the right direction means this can become a reality over time.
Responsible waste management like construction waste disposal in E7 is a vital aspect of sustainable building.
Construction waste is any waste generated from construction activities, whether it is from a site clearance in E7, excavation, renovation, refurbishment, demolition, or road works a lot of it is generated so currently it is a big ask to even think about achieving zero waste within the construction sector, however small steps in the right direction means this can become a reality over time.
Responsible waste management like construction waste disposal in E7 is a vital aspect of sustainable building.