Learn more about Construction Waste in TW15
Construction waste removals from building sites in TW15 produced 46,383 tonnes of construction waste from around 15 active construction sites, all of this construction waste needs to be recycled properly in order for the area of TW15 to become more sustainable.
Construction waste is any waste generated from construction activities, whether it is from a site clearance in TW15, excavation, renovation, refurbishment, demolition, or road works a lot of it is generated so currently it is a big ask to even think about achieving zero waste within the construction sector, however small steps in the right direction means this can become a reality over time.
Responsible waste management like construction waste disposal in TW15 is a vital aspect of sustainable building.
Construction waste is any waste generated from construction activities, whether it is from a site clearance in TW15, excavation, renovation, refurbishment, demolition, or road works a lot of it is generated so currently it is a big ask to even think about achieving zero waste within the construction sector, however small steps in the right direction means this can become a reality over time.
Responsible waste management like construction waste disposal in TW15 is a vital aspect of sustainable building.