Learn more about Muck Away Services in IG2
IG2 is responsible for 45,548 tonnes of construction waste a year that is generated from approximately 28 active sites.
Good muck away services in IG2 operates according to the law and legislation that govern all types of waste to make sure that the muck collected from your sites is safely collected and disposed of securely.
Muck away is defined as the removal of waste materials from a site. There are 3 main categories of muck away, including:
• Inert muck away is defined as a waste that has not gone through any physical, chemical or biological changes and is less likely to have an impact on any other matter that it encounters.
• Hazardous muck away is defined as a gathering of waste that contains properties that make it harmful to the environment and human health.
• Non-hazardous muck away includes a collection of different waste products that are not harmful to the environment and human life.
The authorities have put a target of achieving zero waste within the construction sector within the next few years and with a tailored approach over time it is possible. An average of 45,548 tonnes of construction waste generated by 28 active construction sites means IG2 has an impact on 's sustainability performance..