Learn more about Muck Away Services in TW18
TW18 is responsible for 44,206 tonnes of construction waste a year that is generated from approximately 14 active sites.
Good muck away services in TW18 operates according to the law and legislation that govern all types of waste to make sure that the muck collected from your sites is safely collected and disposed of securely.
Muck away is defined as the removal of waste materials from a site. There are 3 main categories of muck away, including:
• Inert muck away is defined as a waste that has not gone through any physical, chemical or biological changes and is less likely to have an impact on any other matter that it encounters.
• Hazardous muck away is defined as a gathering of waste that contains properties that make it harmful to the environment and human health.
• Non-hazardous muck away includes a collection of different waste products that are not harmful to the environment and human life.
An average of 44,206 tonnes of construction waste generated by 14 active construction sites means TW18 has an impact on 's sustainability performance. If we are to achieve zero waste from the construction industry, then work needs to be done over the next decade to see this come to light..