Learn more about Waste Recycling in RM6
RM6 is 8.4 square kilometres containing 3 inner areas. and is a lot of people so work needs to be done to make RM6 more environmentally friendly. On top of that With 66 active businesses all having an impact on the way RM6’s commercial waste is treated..
Waste recycling once a waste removal has been carried out is a vital process for the health and condition of our environment and it should not be seen as a chore but a necessity if we are to improve the health of our planet
ELWA (East London Waste Authority) has been set up between Redbridge, Havering, Barking & Dagenham and Newham to deal with waste more efficiently in East London along with the waste contractor Havering Recycling Service they achieve a recycling rate of 38.56%, which is low when comparing it with other areas in Europe, 60%+ should be achievable. We send 61.44% of waste to landfill which needs to change
To ensure we shift the perspective of our industry, waste recycling after the waste collection must increase and must be done in a way that is professional and in alignment with certain standards, only then can the industry evolve.
£3,109,418.00 is spent annually by the local authorities and councils in RM6 on public waste removal and waste disposal, however considering where we are at regarding needing to improve our recycling rates could more money be allocated to public waste processing in RM6? By 52,702 people of RM6 then it is only £59 per individual.
The two different types of waste are household and business and both have two different angles of responsibility:
1. Household waste comes from residential properties. Which RM6 produces 8,522 tonnes of domestic waste and only recycles 38.56%, this means 13,578 is sent to landfill each year. In this instance it is the overall responsibility of RM6’s councils or boroughs to carry out the waste clearances and treatment properly.
2. Business waste is classified as any type of waste generated from a waste clearance of a commercial activity. Which 66 active businesses in RM6 produces 21,865 tonnes of commercial waste and 4,532 tonnes of hazardous waste. It is the responsibility of the business that has produced it to perform proper waste clearance and waste treatment.
Waste recycling once a waste removal has been carried out is a vital process for the health and condition of our environment and it should not be seen as a chore but a necessity if we are to improve the health of our planet
ELWA (East London Waste Authority) has been set up between Redbridge, Havering, Barking & Dagenham and Newham to deal with waste more efficiently in East London along with the waste contractor Havering Recycling Service they achieve a recycling rate of 38.56%, which is low when comparing it with other areas in Europe, 60%+ should be achievable. We send 61.44% of waste to landfill which needs to change
To ensure we shift the perspective of our industry, waste recycling after the waste collection must increase and must be done in a way that is professional and in alignment with certain standards, only then can the industry evolve.
£3,109,418.00 is spent annually by the local authorities and councils in RM6 on public waste removal and waste disposal, however considering where we are at regarding needing to improve our recycling rates could more money be allocated to public waste processing in RM6? By 52,702 people of RM6 then it is only £59 per individual.
The two different types of waste are household and business and both have two different angles of responsibility:
1. Household waste comes from residential properties. Which RM6 produces 8,522 tonnes of domestic waste and only recycles 38.56%, this means 13,578 is sent to landfill each year. In this instance it is the overall responsibility of RM6’s councils or boroughs to carry out the waste clearances and treatment properly.
2. Business waste is classified as any type of waste generated from a waste clearance of a commercial activity. Which 66 active businesses in RM6 produces 21,865 tonnes of commercial waste and 4,532 tonnes of hazardous waste. It is the responsibility of the business that has produced it to perform proper waste clearance and waste treatment.